Furnirem
Solid Wood Rectangle Dining Table Base 4-Legs
Solid Wood Rectangle Dining Table Base 4-Legs
Couldn't load pickup availability
SHIPPING AND PAYMENTS INFORMATION
SHIPPING AND PAYMENTS INFORMATION
Payment Methods
Orders may be processed online, using a credit or debit card (currently VISA, MasterCard, American Express, Discover, Diners Club as well as, ShopPay, Google Pay, Meta Pay, Amazon Pay and Apple Pay Express Checkout)
Shipping
We dedicate 3-9 business days to handle and carefully prepare your items for shipment. Please be aware that processing times may vary, especially during peak seasons or special promotions.
Please note that all items are handcrafted in our production facility located in America and will be shipped from America.
Transit time is 2-5 business days. Anticipate an estimated total delivery time of approximately 5-14 business days, encompassing the handling time of 3-9 business days. While we strive for swift deliveries, please bear in mind that unforeseen circumstances may influence delivery times. Rest assured, our team is dedicated to minimizing any delays and ensuring the fastest possible delivery to your doorstep.
RETURN & REFUNDS
RETURN & REFUNDS
We have a 14-day return policy, which means you have 14 days after receiving your item to request a return.
To be eligible for a return, your item must be in the same condition that you received it, unworn or unused, with tags, and in its original packaging. You’ll also need the receipt or proof of purchase.
To start a return, you can contact us at support@decoratingmemories.com. If your return is accepted, we’ll send you instructions on how and where to send your package. Items sent back to us without first requesting a return will not be accepted. The buyer is responsible for return and exchange shipping fees. The buyer have 30 days to return it back to us. 30 day period starts when you receive your order.
You can always contact us for any return question at support@decoratingmemories.com.
Refunds
We will notify you once we’ve received and inspected your return, and let you know if the refund was approved or not. If approved, you’ll be automatically refunded on your original payment method. Please remember it can take some time for your bank or credit card company to process and post the refund too. If more than 15 business days have passed since the return was approved, please contact us at support@decoratingmemories.com.
Damages and issues
Please inspect your order upon reception and contact us immediately if the item is defective, damaged, or if you receive the wrong item so that we can evaluate the issue and make it right.
Exchanges
The fastest way to ensure you get what you want is to return the item you have, and once the return is accepted, make a separate purchase for the new item.
If you have any further questions or concerns regarding our refund policy, please don't hesitate to reach out to us at support@decoratingmemories.com.
Butterfly Wooden Table Base – 4-Leg Design for Rectangular Tabletops
Transform your tabletop into a functional and stylish centerpiece with our handcrafted Wooden 4-Leg Table Base, thoughtfully designed for rectangular tabletops. Whether paired with wood, glass, marble, or metal, this versatile base combines timeless elegance with exceptional stability and durability.
Features
- Customizable Compatibility: Perfectly supports a variety of rectangular tabletops, including wood, glass, marble, and metal.
-
Choice of Accessories:
- Installation Hardware for securely attaching wooden tabletops.
- Adhesive Anti-Slip Pads to stabilize glass or non-wood tabletops without installation.
- Recommended Tabletop Sizes: Available in 3 different sizes, we recommend different sizes of table tops for the table legs. Before placing your order, we strongly recommend that you review the info-graphic design in the product photos.
- Sturdy and Reliable Design: Carefully crafted to provide exceptional stability and accommodate weights up to 440 lbs.
- Timeless Elegance: The butterfly-inspired 4-leg design, made from premium solid wood, enhances any decor style, from modern to rustic.
- Handcrafted Durability: Expertly made with a smooth, durable finish for lasting quality.
Specifications
- Material: Premium solid wood
- Finish: Smoothly sanded and treated for durability
-
Base Dimensions:
- Small: 39” L x 25” D (100 x 65 cm)
- Medium: 47” L x 25” D (120 x 65 cm)
- Large: 55” L x 25” D (140 x 65 cm)
- Height: 29” (74 cm)
- Weight Capacity: Supports up to 440 lbs
What’s Included
- Wooden 4-leg base
- Accessories based on your tabletop material:
- Installation hardware for wooden tabletops
- Adhesive anti-slip pads for glass or non-wood tabletops
How It Works
Simply specify your tabletop material when placing your order, and we’ll include the necessary accessories to ensure a secure and stable fit.
Create a table tailored to your style with our Wooden 4-Leg Table Base. Whether it’s for dining, working, or displaying, this base offers the perfect blend of elegance, functionality, and customization for your next design project.
Great table . I did upgrade the glass antislip and felt stickers
It arrived quickly and good condition
Gute Qualität, Farbe ist leider etwas dunkler ausgefallen als auf der Farbpalette
Finally got it set up. I was a little worried that it might be a bit unstable with a 2mx1m glass table top but the weight actually makes it super stable. Very satisfied
Excellent table base with modern unique shape, love it!














